Snoopy49 Posted January 2, 2013 Report Share Posted January 2, 2013 My car has been in production since Dec 18th and on the 21st it was on the Trim Line. When I contacted SVT @ FCS, I was told that it was scheduled for build on Jan 14th. They were not able to explain the discrepancy between the Dec 21st date and the Jan 14th date. I called the plant at Flat Rock and was told the line was down until Jan 14th for retooling and my car along with all the other cars on the line were covered in plastic until the line starts back up on the 14th. I have to look on the bright side, at least it's not sitting out in the snow. Quote Link to comment Share on other sites More sharing options...